Parris Construction Management Awarded Significant Infrastructure Modernization Contract at Spaulding Skilled Nursing Center

Enhancing Operational Capabilities to Ensure Safety & Efficiency

South Easton, MA – April 1, 2024: Parris Construction Management is excited to announce the award of a significant infrastructure project with the Spaulding Skilled Nursing Center in Brighton, Massachusetts. The key project will enhance the center’s operational capabilities and ensure the utmost safety and efficiency for its residents and staff. The project includes the replacement of the emergency generator system, the expansion of the loading dock area and equipment, and relocation of the compactor, to accommodate increased demand.

The Emergency Generator Replacement and Loading Dock Expansion project, scheduled to begin in April 2024, is a proactive measure undertaken by Spaulding Skilled Nursing Facility to modernize its facilities and better serve its community. The aging emergency generator system will be replaced with a new state-of-the-art 275KW Emergency Generator, ensuring reliable backup power in the event of unforeseen power outages or emergencies. This upgrade aligns with Spaulding’s commitment to providing uninterrupted care and support to its residents, even during challenging circumstances.

In addition to the generator replacement, the project includes the expansion of the center’s loading dock area and equipment. With the growing needs of the center and increased deliveries of essential supplies and equipment, the expansion will streamline logistical operations and improve the overall efficiency of goods handling. The expanded loading dock will feature modern amenities and infrastructure, allowing for smoother inbound and outbound logistics and reducing congestion in the center’s delivery area.

“We are thrilled to embark on this important project with Spaulding that underscores their dedication to the safety, comfort, and well-being of their residents and staff,” said Bob Parris, CEO & President of Parris Construction Management. “By investing in cutting-edge technology and infrastructure upgrades, Spaulding is reaffirming their commitment to providing high-quality care and maintaining their position as a leader in skilled nursing services.”

The Emergency Generator Replacement and Loading Dock Expansion project is expected to be completed by September 2024, with minimal disruption to daily operations. Throughout the construction phase, together with Spaulding Skilled Nursing Center, Parris Construction Management will implement comprehensive measures to ensure the safety and comfort of residents, staff, and visitors.

About Spaulding Skilled Nursing Facility: Spaulding Skilled Nursing Center, located in Brighton, Massachusetts, is a leading provider of skilled nursing and rehabilitation services. With a dedicated team of healthcare professionals and state-of-the-art facilities, Spaulding is committed to delivering compassionate care and empowering individuals to achieve their highest level of independence and quality of life.

About Parris Construction Management: Parris Construction Management, based in South Easton, Massachusetts, is a leading provider of construction management services across a diverse range of industries. With a focus on integrity, innovation, and client satisfaction, Parris Construction Management delivers tailored solutions to meet the unique needs of each project, from concept to completion.

###